Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/forge/faubourg.ayctor.dev/wp-includes/functions.php on line 6114
Réalisation d'un Entrepôt sec Xpo Logistics pour Xpo Logistics à Fos-sur-Mer (13) | FAUBOURG PROMOTION

Xpo Logistics

42 568 m²

BREEAM

Faubourg Promotion au côté du constructeur IDEC, ont développé pour le compte d’XPO Logistics une plateforme logistique d’une surface totale de 43 000 m².

Enjeux
Réponses

Galerie